A wide variety of assignments have been successfully undertaken by Neil Barker of Cavendish Consultants. Some examples are highlighted below.

Project Manager, Hunterston "B" Nuclear Power Station.
Fluor Energy, British Energy, Barnwood.
Undertook outage and new build project, on completion of the outage this gave the start for the new project work, including leading a team of new and power-station resident engineers taken from the British Energy engineering teams.

----------------------------------------------------------------------------------------------

Engineering Construction Manager for Duke Fluor Daniel in Camberley & various UK sites. Project value £450 to £550 Million. Assisted in several project bid packages including an 800 MW CCGT Power station, advising on the construction, commissioning, safety procedure development, scheduling and planned maintenance.
The main units being Mitsubishi MH 701 F GTG and MHI Steam Turbines. Client: Aqulila Energy London/Kansas City.

Also a 400MW CCGT in Dublin, 400MW CHP in Skogen Norway, an 800 MW CHP in Kazakhstan, and undertaking due-diligence reports for Duke Energy.

----------------------------------------------------------------------------------------------

Project Site Construction Manager for Siemens Westinghouse Power Corporation in Illinois USA. Client: Ameran Power USA. Project value: $245 Million.
Responsible for leading a team of site engineers to control the contractor during all stages of the project, reviewing design, budget control, delivery dates of SWPC supplied equipment, attending client/contractors weekly site meetings and Head office project meetings in Orlando.

Constructing and commissioning a 280 MW Power Station for Ameran Power of
St. Louis. Duties: overall in charge of all site activities, supply, safety, construction, readiness review, start-up commissioning and training of the O&M team, finalising all documentation and hand over to the client.

----------------------------------------------------------------------------------------------

Project Lead Construction Engineer for Raytheon Engineers & Constructors Ltd.
Location: Damhead Creek. Project value: £420 million.
This project was an 800 MW CCGT, consisting of two 701F2 MHI Gas Turbines multiple shaft configuration and two horizontal natural circulation horizontal flow NEM HRSG's, one MHI Steam Turbine with a downward exhaust, Three hydrogen cooled Generators with all associated auxiliary equipment and support facilities including a 24 celled air cooled condenser, natural gas fuelled start-up aux-boiler.
As Lead Engineer my duties were to cover all field engineering functions including design change and production, leading a team of Engineers and Superintendents controlling the main contractors. Commissioning and start-up with a full training programme backed by Head Office and the vendor specialists.

----------------------------------------------------------------------------------------------

Project Construction/Site Construction Manager for PowerGen International Plc.
Projects Department. Location: India. Project value £ 650 million.
Managing an overseas assignment, holding co-ordination meetings with partners in Bombay and the EPC contractor Siemens A.G. Frankfurt. The project was a coal fired 1000 MW power station to be built in two phases, the first being 2 x 289 MW TPS Siemens turbines and associated steam generation units and BOP. Based in Bhopal, India taking overall complete charge of safety, construction leading on to commissioning with a strong input to our Indian partners to include QA/QC.

 